Which two of the following steps are necessary to configure inter-VLAN routing between multilayer switches?()
A.Configure a dynamic routing protocol.
B.Configure SVI interfaces with IP addresses and subnet masks.
C.Configure switch ports with network addresses.
D.Configure switch ports with the autostate exclude command.
E.Document the MAC addresses of the switch ports.
您可能感興趣的試卷
你可能感興趣的試題
A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.
What might explain what happened? ()
A.The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.
B.The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.
C.The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.
D.The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.
You have just created a new VLAN on your network for inter-VLAN routing.
What is one step that you should include in your VLAN-based implementation and verification plan?()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN.
D.Verify that the VLAN virtual interface has been correctly created and enabled.
You have just created a new VLAN on your network for inter-VLAN routing.
What is one step that you should include in your VLAN-based implementation and verification plan?()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN.
D.Verify that the VLAN virtual interface has been correctly created and enabled.
You have just created a new VLAN on your network.
What is one step that you should include in your VLAN-based implementation and verification plan? ()
A.Verify that trunked links are configured to allow the VLAN traffic.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
D.Verify that different native VLANs exist between two switches for security purposes.
You have just created a new VLAN on your network.
What is one step that you should include in your VLAN based implementation and verification plan? ()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command.
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan
A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.
You are planning a new VLAN-based network solution.
What is one item you should consider when creating your implementation plan as it concerns VLANs?()
A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and configured
C.administrator assignments
D.rollback plan
A.default VLAN information for all unused switch ports
B.802.1x configuration parameters
C.number of IP subnets needed
D.IP routing protocol information
During testing of network redundancy in a fully meshed enterprise campus, a problem has been reported. Both distribution multilayer switches are fully configured for redundancy; clients operate normally when the primary multilayer distribution switch is operating. All clients drop connections outside of their respective access layer group when the primary distribution switch is shut down and the secondary distribution switch is still operational. Additional information indicates that the secondary distribution switch is able to ping major corporate and Internet locations.
Which item would be the best point of troubleshooting for this connectivity issue? ()
A.client network configuration
B.VLAN mapping
C.inter-switch trunk configuration
D.UDLD configuration
E.first-hop redundancy protocol
最新試題
DS2 has not become the active device for Vlan103’s HSRP group even though all interfaces are active. As related to Vlan103’s HSRP group. What can be done to make the group function properly ? ()
What must be the same to make multiple switches part of the same Multiple Spanning Tree (MST)?()
Based on the show spanning-tree vlan 200 output shown in the exhibit, which two statements about the STP process for VLAN 200 are true? ()
Which two statements are true when the extended system ID feature is enabled? ()
Refer to the exhibit. For what purpose is the command show ip cef used?()
Refer to the exhibit. What command was issued on the Layer 3 switch Sw1 between Exhibit #1 and Exhibit #2?()
Refer to the exhibit. What does the command channel-group 1 mode desirable do? ()
If G1/0/1 on DS1 is shutdown, what will be the current priority value of the Vlan105’s group on DS1 ?()
Refer to the exhibit. LACP has been configured on Switch1 as shown. Which is the correct command set to configure LACP on Switch2?()
During routine maintenance, G1/0/1 on DS1 was shutdown. All other interface were up. DS2 became the active HSRP device for Vlan101 as desired. However, after G1/0/1 on DS1 was reactivated. DS1 did not become the active HSRP device as desired. What need to be done to make the group for Vlan101 function properly ? ()